Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  •  Hello World!
  •  Evaluate charger circuit
  •  Add compiler directive for non-Heltec software build
  •  ADC review for VBAT
  •  ADC review for VSOLAR
  •  Digital CHGST pin read
  •  Rain gauge interrupt routine back online
  •  I2C evaluation with BME280
  •  Weather direction evaluation
  •  Wind speed evaluation
  •  New LoRa radio install for 915MHz
  •  Calibrate ADC for VBAT
  •  Calibrate ADC for VSOLAR
  •  Verify I2C power switch
  •  Verify LoRa power switch

...

I’ll be using Caption tape to insulate the pads from the module electrical points. The good news is that the GND pads and antenna match, so those will be soldered directly.

I2C operating with BME280

Had to add intentional delay for wind speed data collection as there is no WiFi connect negotiations to rely on.