Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 11 Next »

Binding

 

  • Binding process was painless

Required Hardware

 

Think ahead on hardware as this stuff is small and difficult to find. M3 misc nylon hardware arrives on  

3.5mm bullet connectors were also an afterthought. I made a connector holder by drilling a 1/8" hole in a block of wood to hold the connectors while soldering wires to them

Motor spin-up testing

 

  • 1 ESC was EXTREMELY hot to the touch. Discuss with Cyril.
    • Just power to ESC, not motor connected
    • Replaced it

Prop Balancing

Initial Setup and Flight Test

  • James Hughes Meet with Cyril to go through settings/ fine tune

Build TODOs

Arming the drone

Seemed like it did not work all the time.
  • No labels